This three-phased project involved the alteration and extension of various industrial facilities at the IN Bearings Plant in Bynea, Llanelli. Phase 1 involved internal alterations at the existing manufacturing plant in Bynea to form new offices.

Phase 2 involved internal alterations including infrastructure works, construction of pits and bases in preparation for the press plant to be installed.

Phase 3 involved internal alterations to included infrastructure works and construction of pits in preparation for the installation of three furnaces.

CLIENT:
Schaeffler UK Ltd

VALUE:
£1.5m

CONTRACT:
NEC 3 Option E Design and Build

ARCHITECT:
Powell Dobson

STRUCTURAL ENGINEER:
Clarkebond

M&E ENGINEER:
Saba