TIMET UK MANUFACTURING UNIT

The works at Timet UK Ltd’s manufacturing site in Swansea included two phases.

Phase 1 involved the extension of Bays D & E incorporating a steel portal bay form of construction similar to the existing frames together with an extension to the single storey Bay Y . The total extension was approximately 36m long by 52m wide.

Phase 2 involved the making good of the existing buildings after fire damage. The work within W Bay comprised the demolition of several buildings, covering the existing courtyard area and extending W Bay by approximately 18m. The work within Z Bay comprised repair and extension to return the Bay to the condition it was in prior to the fire.

CLIENT:
Timet UK Ltd

VALUE:
Phase 1 – £1.3m, Phase 2 – £1.2m

CONTRACT:
NEC 3 Option C

ARCHITECT:
Atkins

CIVIL & STRUCTURAL ENGINEER:
Atkins